September 10, 2026
The water at Priory Park ran for the last time this year over Labor Day weekend. Labor Day marked the close of River Forest's first-ever splash pad season, and if you've spent any July afternoon at 7354 Division Street watching kids dart between spray jets, it might feel like the park is about to go quiet for a while.
It won't. Over the next several days, the same grounds host a football kickoff event, a 2-mile glow run circling the ball fields, and a family campout pitched a few hundred feet from the splash pad's now-dry concrete. The splash pad wasn't really the story this year. What got built next to it was.
River Forest Park District spent roughly four years planning the Priory Park renovation before a shovel went into the ground. The finished project cost about $800,000, funded through the district's capital improvement budget, and its scope covered three distinct pieces: the 1,700-square-foot splash pad with its nineteen water features, a new picnic shelter, and a 700-square-foot addition to the Priory Center itself.
The program room addition is easy to overlook if you only measured the summer by how often your kids got wet. It gave the Priory Center a dedicated program room, space the district now uses for its summer camp and other scheduled programming. Executive Director Michael Sletten walked River Forest's village board through the full scope back in April 2025, framing the splash pad as the visible piece of a project that was really about expanding what the building itself could do.
The ribbon was actually cut on July 9, weeks after the original construction schedule had targeted a Memorial Day opening. Projects like this rarely land on the exact date first floated in a planning meeting, and a six-week gap between target and ribbon cutting is a modest slip for a build that involved both new concrete work and a building addition tied into existing utilities. The district marked the delayed opening with a proper celebration anyway: DJ music, hot dogs, ice pops, and a chance to meet the Park Board of Commissioners on site.
If you tried to bring your kids to Priory Park at 9 a.m. on a weekday this summer, you found a dry pad and a locked switch. That wasn't an oversight. It's a direct consequence of how the park's water system is built.
Priory Park runs its irrigation and its splash pad off the same water service, and the two can't operate at once. The irrigation system runs overnight instead, which solves half the puzzle. The other half comes from the district's own summer camp, which uses the Priory Center from 8:30 a.m. to 1 p.m. each weekday. With the Priory Center in use for camp each weekday morning, the splash pad's weekday hours didn't start until noon.
The district picked its final hours, weekdays from noon to 6 p.m. and weekends from 10 a.m. to 6 p.m., specifically to catch the warmest part of the day and give working families a window after 5 p.m. still made sense. There's a cost behind that decision too. Because Illinois public health rules require splash pad water to flow through rather than recirculate, the board approved a standing $20,000 annual budget line just for the water and sewer charges tied to running it. Every hour the splash pad sprays is an hour the district is paying for, which is part of why the schedule was built around estimated flow rates rather than left wide open.
The two weeks after Labor Day turn out to be some of the busiest the park sees all year, just for a different reason than July.
| Date | Event | Location |
|---|---|---|
| September 12 | Fall Football Kickoff | Priory Park |
| September 18 | Glow Run (2-mile course) | Priory Park |
| September 18 | Family Campout | Priory Park |
The Glow Run and the Family Campout land on the same day, which means the park hosts two separate scheduled events at once rather than staggering them across the month. The run itself starts with check-in and activities at 6 p.m., a DJ, a photo station, and a t-shirt decorating table before the race begins at 7 p.m. Peak glow effect runs from 7:15 to 7:45 p.m., with the whole event wrapped by 8. Registration opened August 3 at $25 per person for ages six and up, with a deadline of noon on September 16. Every dollar of net proceeds goes to the West Suburban Special Recreation Association, which runs adaptive recreation programs across the west suburbs.
None of that existed in this form before the renovation gave the district usable indoor program space to plan around. A splash pad brings people to a park for an afternoon. A program room lets a park district build a calendar.
If Priory Park were the only project on the district's books, you could read all of this as one lucky park getting an upgrade. It isn't. Constitution Park, also under River Forest Park District management, had its own redevelopment scheduled to run from September 2025 through June 2026. That scope includes a relocated all-inclusive playground, new lighted sand volleyball courts doubling as an ice rink, a community sitting plaza, a new picnic shelter with restrooms, and a relocated baseball field with a 60-foot basepath.
The district didn't just demolish the old Constitution Park playground and haul it away. It was donated to Kids Around the World, an organization that upcycles used playground equipment and installs it in communities abroad that otherwise wouldn't have access to one. This is the same group that handled the district's Keystone, Priory, and Washington playground transitions in years past, which tells you this isn't a one-off arrangement but a standing relationship the district has built over multiple projects.
Separately, Keystone Ballfield #2 is scheduled to close from August 31 through November 13 this year for a turf conversion, part of the district's 2026-2027 capital projects budget, converting the infield from grass and dirt to synthetic turf to accommodate Little League U12 play.
Put together, Priory's splash pad and program room addition aren't an isolated bet on one park. They're one piece of a multi-year, multi-park capital push that's been running since at least 2024, when the district first put out its request for design proposals on the Priory splash pad and building addition.
The splash pad closing over Labor Day weekend isn't the end of anything. It's the point where the park's second identity, the one built around the program room rather than the water jets, takes over for the rest of the year. If you've got kids in camp programming, watch for how the district uses that new space once cooler weather sets in. If you're the kind of resident who tracks the Glow Run or the Party in the Park series, September 18 is shaping up to be a two-event day at a park that, eighteen months ago, didn't have the infrastructure to host either one on the same evening as something else.
River Forest keeps investing in its parks in ways that don't always show up until you're standing in one and notice the calendar posted at the entrance. That kind of steady, unglamorous public investment tends to matter more to daily life here than any single ribbon cutting does.
If you're weighing what it's like to actually live near a park like this, or you're curious how amenities like Priory's renovation factor into how people think about neighborhoods here, the team at Zachary Knebel spends its days in these details. Schedule a consultation whenever you're ready to talk through what River Forest living actually looks like, season to season.
Stay up to date on the latest real estate trends.
From the first consultation to closing, we are with you every step of the way. With deep local market knowledge, transparent communication, and an unwavering commitment to excellence.